Connect renewables to the grid without late-stage technical surprises. Grid-code checkpoints, study inputs, protection, and power-quality engineering sequenced to protect schedule and approvals.
Grid integration failures usually show up late: study rework, protection changes, missed power-quality limits, or controls that don’t meet grid-code expectations. MetRenew structures grid readiness from the start defining interconnection strategy, study inputs, protection and power-quality requirements, and evidence needed for utility approval. The outcome is fewer redesign loops, cleaner coordination between engineering and delivery teams, and a smoother path from application to energization and performance compliance.
Clarify the grid pathway early: applicable grid code, compliance checkpoints, interface boundaries, and utility submission expectations. We translate requirements into an execution plan so engineering inputs are correct upfront reducing rework, minimizing approval churn, and protecting COD sequencing.
Prepare a study-ready technical package for load flow, short-circuit, dynamic performance, and reactive capability requirements plus assumptions discipline and data consistency. We help teams avoid repeated submissions by aligning models, parameters, and evidence with utility review expectations.
Define protection philosophy, relay coordination interfaces, metering, and grounding/earthing requirements across plant and grid interface equipment. The goal is simple: prevent late-stage redesign caused by protection conflicts, unclear responsibilities, or missing interface definitions.
Engineer for compliance with harmonic limits, flicker, and voltage/reactive power requirements. We align inverter settings, compensation strategy, and compliance testing approach so power-quality constraints don’t appear during commissioning when fixes are slow and expensive.
Specify plant controller functionality (active/reactive control, ramping, curtailment response) and utility telemetry/SCADA interfaces. We structure evidence packs and test readiness so the plant behaves predictably under grid events and meets acceptance criteria at energization.
A greenfield renewable plant requires fast approvals and minimal resubmissions. Outcome: clear grid-code pathway, consistent study inputs, and interface definitions that reduce review cycles and protect commissioning sequence.
Voltage stability and fault performance risks appear late in studies. Outcome: early constraint visibility, controls and reactive strategy alignment, and a compliance plan that reduces redesign risk and energization delays.
Dispatch, ramping, and reactive obligations require coordinated controls. Outcome: plant control and telemetry design that meets grid requirements, supports operational flexibility, and reduces acceptance-test failures.
Different sites use different assumptions and study packs. Outcome: a repeatable grid readiness framework consistent data packs, model governance, and compliance evidence so teams move faster with fewer surprises.
Grid compliance is treated as a delivery constraint, not a paper exercise so engineering decisions remain buildable and commissioning-ready.
We emphasize study inputs, traceable assumptions, and acceptance-proof documentation so approval conversations are faster and less subjective.
Grid integration connects to permitting, EPC delivery, and operations telemetry so the plant performs as intended, not just “passes on paper.”
De-risk grid approvals before engineering locks in
It covers the technical pathway from interconnection strategy to compliance evidence grid-code checkpoints, power system studies inputs, protection/interface engineering, power quality requirements, and control/telemetry readiness so approvals and commissioning stay aligned.
Most utilities require a combination of load flow, short-circuit, dynamic performance, and reactive capability assessment often alongside power-quality and harmonic compliance evaluation. The exact scope depends on grid code and network conditions.
We support the pathway: preparation of study-ready inputs, assumptions governance, and evidence packaging, and we help coordinate responses to technical queries. Local statutory submissions remain with the project owner or appointed local parties.
It prevents late-stage rework where protection changes, power-quality issues, or control limitations force redesign during procurement or commissioning, when time and cost impact is highest.
Single-line diagram (or concept), capacity/technology mix, point of interconnection, preliminary electrical design assumptions, inverter/BESS specs if available, and any utility guidance notes or application requirements.
Yes. We align plant controls, telemetry, and compliance evidence for hybrid controllability so the plant can meet active/reactive behavior requirements and operate predictably under dispatch and grid events.
We define compliance constraints early, align inverter settings and compensation strategy, and structure test readiness so power-quality compliance is validated with evidence before it becomes a commissioning blocker.
A coherent grid readiness package: clearly defined requirements, consistent study inputs, interface/protection philosophy, power-quality approach, and an acceptance-test/evidence plan that supports approval, energization, and COD.
Let’s Connect
Whether you’re evaluating a new project, strengthening feasibility, preparing for EPC execution, or building ESG readiness, we’ll help you clarify the next steps and structure the path forward with measurable delivery milestones.